5/5/09

More process

Above, shows the inner frame, for the frame below, with the red and yellow bole application. The inlet splines I install on certain frames, is visible at the lower right. The frame below has a blind frame installed. The spline still needs to be planed flush with the edge of the frame. That will be done after the final toning of the frame, just before the two frames are assembled.